MMERIDIANINFRASTRUCTURE
ProjectsWater & EnvironmentMahanadi Barrage & Flood Control
Water & Environment · Under construction

Mahanadi Barrage & Flood Control

Cuttack, Odisha · State Water Resources Department · 2024
₹1,280 CrContract value · 38 months
Mahanadi Barrage & Flood Control
Project overview

Barrage · Flood control · Gates

A river barrage with radial flood gates, fish ladder and embankment strengthening — managing flood risk for a delta city while securing dry-season supply.

Barrage length1.2 km
Gates32 radial
Design flood44,000 cumec
Contract value₹1,280 Cr
Duration38 months

Scope of work

  • Barrage piers and raft on diaphragm walls
  • Radial gates and hoist mechanisms
  • Embankment strengthening and revetment
  • Fish ladder and navigation lock
Start a project