MMERIDIANINFRASTRUCTURE
ProjectsIndustrial & LogisticsParadip Breakwater Extension
Industrial & Logistics · Under construction

Paradip Breakwater Extension

Paradip, Odisha · Major Port Authority · 2024
₹1,120 CrContract value · 32 months
Paradip Breakwater Extension
Project overview

Marine · Breakwater · Armour units

An extension to a port breakwater using accropode armour units — deep-sea placement and rubble-mound construction that calms the harbour for all-weather berthing.

Breakwater1.4 km extension
Armour units9 t accropodes
Wave design9.5 m significant
Contract value₹1,120 Cr
Duration32 months

Scope of work

  • Rubble-mound core placement
  • Accropode armour unit casting & placing
  • Crown wall and capping
  • Bathymetric survey and monitoring
Start a project