MMERIDIANINFRASTRUCTURE
ProjectsEnergy & PowerSubansiri Lower HEP — Spillway
Energy & Power · Commissioned

Subansiri Lower HEP — Spillway

Assam–Arunachal border · National Hydroelectric Corporation · 2024
₹2,980 CrContract value · 54 months
Subansiri Lower HEP — Spillway
Project overview

Hydroelectric · Spillway · Mass concrete

The spillway, energy dissipation and intake works of a major Himalayan hydroelectric scheme — mass concrete placed at altitude through a short working season.

Spillway bays8 radial gates
Mass concrete1.4 m m³
Design flood37,500 cumec
Contract value₹2,980 Cr
Duration54 months

Scope of work

  • Mass-concrete spillway and ogee crest
  • Radial gates and hydro-mechanical works
  • Stilling basin and energy dissipators
  • Intake structure and approach channel
Start a project