Transportation & Mobility · Completed
Narmada Cable-Stayed Bridge
Bharuch, Gujarat · State Roads & Bridges Corporation · 2024
₹1,840 CrContract value · 42 months

Project overview
Cable-stayed · 1.9 km · Extradosed
A 1.9-kilometre cable-stayed crossing of the Narmada — a single 320-metre navigation span over the river, built through two monsoon seasons without a lost-time injury.
Total length1.9 km
Main span320 m
Pylon height118 m
Contract value₹1,840 Cr
Duration42 months
Scope of work
- Deep well foundations to 48 m below bed level
- Twin 118 m concrete pylons, slip-formed
- Cast-in-situ segmental deck on form travellers
- 84 stay cables with active monitoring
- Approach viaducts and toll plaza
Outcomes
- Delivered five weeks ahead of programme
- Cut the regional river detour by 38 km
- Zero lost-time injuries across 4.6 m man-hours
Related work
More in Transportation & Mobility
Under constructionTransportationValsad–Palghar2025
Surat–Mumbai Expressway · Package 7
National Highways Authority (HAM)
8-laneHAM62 km
₹2,650 CrView project →
CommissionedTransportationPune, Maharashtra2024
Pune Metro Line 3 — Civil Package
Maha Metro
Elevated metro9 stations14.6 km
₹1,320 CrView project →
CompletedTransportationMumbai, Maharashtra2024
Mumbai Coastal Road Tunnel
Municipal Corporation
TBM12.2 m boreTwin tube
₹3,950 CrView project →