Narmada Cable-Stayed Bridge
Project overview

Cable-stayed · 1.9 km · Extradosed

A 1.9-kilometre cable-stayed crossing of the Narmada — a single 320-metre navigation span over the river, built through two monsoon seasons without a lost-time injury.

Total length1.9 km
Main span320 m
Pylon height118 m
Contract value₹1,840 Cr
Duration42 months

Scope of work

  • Deep well foundations to 48 m below bed level
  • Twin 118 m concrete pylons, slip-formed
  • Cast-in-situ segmental deck on form travellers
  • 84 stay cables with active monitoring
  • Approach viaducts and toll plaza

Outcomes

  • Delivered five weeks ahead of programme
  • Cut the regional river detour by 38 km
  • Zero lost-time injuries across 4.6 m man-hours