MMERIDIANINFRASTRUCTURE
ProjectsTransportation & MobilitySurat–Mumbai Expressway · Package 7
Transportation & Mobility · Under construction

Surat–Mumbai Expressway · Package 7

Valsad–Palghar · National Highways Authority (HAM) · 2025
₹2,650 CrContract value · 30 months
Surat–Mumbai Expressway · Package 7
Project overview

8-lane · HAM · 62 km

A 62-kilometre, eight-lane access-controlled package of the Surat–Mumbai corridor under the Hybrid Annuity Model, including a four-level interchange and 14 major structures.

Length62 km
Configuration8-lane access-controlled
Major structures14
Contract value₹2,650 Cr
ModelHybrid Annuity (HAM)

Scope of work

  • Embankment & flexible pavement, 62 km
  • Four-level grade-separated interchange
  • 14 major bridges and 38 minor structures
  • Intelligent transport & tolling systems
  • Wayside amenities and EV charging bays